Pages

Wednesday, December 19, 2012

Bridge Construction

Tell me this bridge doesn't evoke a TARDIS feeling.  That's a basic hex base for a 28mm figure with cereal packet painted with dials, screens, and other controls.  I took the same style syringe cap used for the engines and stuffed it full of green and unpainted toothpicks.  The whole mess fit perfectly wit the bamboo skewer coming down from the nose of the ship.  Green felt serves as carpet and completes the upper bridge.
In scale, that platform is waist-high, so I'll need to add some steps up yet.  The rest of the level is still pretty barren, so we're looking at more control tables and screens somewhere down the road.

1 comment:

Given the failure of the spam filters recently, we're going full Moderation on comments. Apologies for the trouble.